Slab dimensions
Pour summary
Area
200 sq ft
Concrete
2.75 cu yd
ready-mix, incl. waste
Mesh
5 sheets
6×6 W1.4/W1.4
Control joints
2
panels, ~10ft spacing
Walks, patios & basement floors: 6×6 welded-wire mesh (or #3 @ 18″) is typical for crack control.
Materials list
| Item | Qty | Unit |
|---|---|---|
| Ready-mix concrete | 2.75 | cu yd |
| Welded-wire mesh 6×6 | 5 | sheet (5′×10′) |
| Edge forms (2×4) | 5 | board (12ft) |
| Form stakes | 34 | each |
| Concrete sealer 1 coat(s) @ 250 sq ft/gal | 1 | gal |
Notes
- Reinforcement guidance is general crack-control practice, not a stamped structural design — verify against local code, soil, and load.
- Control joints ~every 10 ft; cut ~¼ the slab depth within 6–12 hours of the pour, and isolation joints at fixed structures.
- Slope exterior flatwork ~¼″ per foot away from structures for drainage.
Powered by Breeze — quoting and takeoff software built by a working contractor. Reinforcement guidance is general residential crack-control practice, not a stamped structural design. Verify thickness, reinforcement, and permit requirements with your local building department before pouring.